|
Step
1
Case Layout and Mounting the
PixController Universal Board. |
Step
2
Mounting the U-Bolts. |
Step
3
Mounting the external
switch. |
Step
4
Wiring and configuring the
2.5mm port solder jumpers. |
Step
5
Mounting the PIR Lens,
Camera lens glass, and flash glass. |

The next step in this project is to install the U-Bolt kit. The
U-Bolts will allow
you to easily attach your trail camera to a tree. We like to align
the U-Bolts
are in the middle of the PIR sensor and the camera flash hole. This
will allow
you to run a locking cable such as the Master Lock Python cable
through
U-Bolts, around the front of the case, and around the tree. Use a
square
to mark the center and make a mark using a marker to mark the center
of
U-Bolts.

Once you have the center marked mark the 2 locations to drill the
holes for
the U-Bolts as shown above. Do this for both sides of the case.

Use an awl to mark the center before drilling.

Drill the U-Bolt holes using a 7/64" drill bit.

Next place 2 of the 1/4-20 nuts on the U-Bolt kits as shown. Note,
you
can paint your U-Bolts black, or what ever color you like before
installing them.
This will give you a more finished look when complete.

Next install the U-Bolts into the holes as shown above. Do this for
both sides of the case.

Lastly put the remaining 1/4-20 nuts on the inside of the case as
shown above.
Go to Step 3
|